GEORGIA - PROF. GUDUSHAURI GENERAL HOSPITAL REHABILITATION

Tekfen Job No:

259

Location:

Tbilisi, Georgia

Client:

Ministry of Health, Georgia

Contractor:

Tekfen Construction and Installation Co., Inc. - Hallesche Mitteldeutsche Bau A.G.* J.V.

*(HMB, Germany is a Tekfen affiliate)

Tekfen Portion:

40%

Commencement:

15/05/2001

Completion:

20/10/2002

The Projectís scope covered rehabilitation of 52.000 m2 existing hospital facilities while providing all system, infrastructure works and furniture requirements of the Prof. Gudushauri General Hospital in Tbilisi, Georgia.

The project was successfully executed and delivered according to the schedule. Geotek, a partnership of Tekfen with Georgian International Oil Company, has participated in this project as general subcontractor to HMB - Tekfen J.V.

MAIN QUANTITIES

Reinforced Concrete (C35): 6.800 m3
Lean Concrete (C20): 5.000 m3
Reinforcing Steel: 520 t
Steel Structures: 130 t
Suspended Ceiling: 17.000 m2
Plastering and Painting: 37.800 m2
Ceramic Tile: 19.000 m2
Leveling Concrete: 51.000 m2
Marble: 1.100 m2
Roofing Works: 9.000 m2
Doors, Windows, Partitions: 6.800 m2
Furniture: 260 units

Complete electrical, mechanical and instrumentation works, sanitary and waste treatment system, underground water reservoirs (560 t), boiler house, power transformer room and spare generator units were also included within the project scope.