TURKEY - PERŞEMBE - BOLAMAN COASTAL MOTORWAY

Tekfen Job No:

225

Location:

Ordu, Turkey

Client:

General Directorate of Highways

Contractor:

Tekfen Construction and Installation Co., Inc. - Nurol - Yüksel J.V.

Tekfen Portion:

33%

Commencement:

02/10/1997

Completion:

31/07/2008

Having successfully completed the US$ 2 Billion worth, 258 km long Tarsus-Adana-Gaziantep, TAG Motorway scheme as of September 2002, Tekfen Construction and Installation Co., Inc. sails to new challenging horizons. TAG Motorway was the largest project implemented by Tekfen within the scope of a single contract.

Presently, as a member of two separate J.V. groups, Tekfen has undertaken major responsibilities at three new motorway projects, all being located along the rough and mountainous regions of Turkey.

HIGHLIGHTS

27 km, 2x2 lane motorway,
44 viaducts with a total length of 8.141 m,
2 main interchanges,
5 double tube tunnels with a total length of 4.716 m; one being the longest motorway tunnel in Turkey with a length of 3.850 m.