Project comprises construction and 400 days maintenance of two separate road sections as described here below :
Contract 2 Section (Km : 4 +000 – Km : 37 +000):
Contract 2 Section starts at Duhail, passing through sub-urban and rural areas to the North of Doha City, namely Duhail, Kheesa, Khuraitiyat, Umm Salal Ali, Umm Salal Mohammad and Umm Garn. The Contract 2 Section also includes the Simaisma road link.
Contract 3 Section (Km : 37+000 – Km : 98 +200):
Contract 3 Section starts near Al Khafaij area, passing through rural areas, namely North Military Camp, Al Khaaban, Al Juthay, Fuwairit, Al Ghariya, Athba Al Shamaliyah and Madinat Al Shamal.
Scope:
- 94,2 km of 2 x 4 Main Highway (North Road),
- 4 km of 2 x 3 Highway (Simaisma Road),
- Approx. 12,1 km of 2 x 2 Road (Crossing Roads),
- Approx. 61,8 km of 2 x 1 Road (single carriageway),
- Connections with the surrounding Road Network and Services,
- 9 ea. Dual Carriageway Bridges,
- 11 ea. Single Carriageway Bridges,
- 3 ea. Underpasses,
- 5 ea. Camel Crossing Underpasses,
- Stabilized Earth Retaining Walls,
- Maintenance of traffic and detours, Relocation, Realignment and Diversion of Existing Utilities, Electrical and Telecommunication Works,
- Road Lighting Works including the installation of Street Lighting Columns and High Masts (160 km of roads),
- Landscaping & Irrigation,
- Approx. 13,7 km Drainage Works,
- 3 ea. Weigh Stations,
- 5 ea. Rest Areas,
- Telecommunication Works; (Q-Tel Lines 109 km, Emiri Signal Lines 160 km),
- Ducting for Intelligent Transport Systems (110 km),
- Ducting for Doha Street Surveillance Systems (110 km),
- Traffic Signing and Marking,
- Traffic Safety Installations,
|