SAUDI ARABIA - JUAYMAH GAS PLANT TO BERRI ETHANE PIPELINE

Tekfen Job No:

255

Location:

Juaymah, Berri & Jubail Areas, Saudi Arabia

Client:

Saudi Arabian Oil Company (Saudi Aramco)

Contractor:

Tekfen Construction and Installation Co., Inc.

Tekfen Portion:

100%

Commencement:

17/12/2000

Completion:

30/06/2002

The scope of the project covers;

Construction of (Fusion Bonded Epoxy, FBE coated) buried 38’’ x 36 km and 30’’ x 0,47 km pipelines from Juaymah to Berri Junction,
Above ground (painted) 20’’ x 0,580 km and 16’’ x 1,90 km loop lines at Royal Commission Area and installation of by-pass line 20’’ x 0,580 km at Berri Junction,
Upgrading of piping at Juaymah Gas Plant and Berri Junction,
Procurement of (below 24’’ dia) pipes, fittings and valves.

High amount of Hot Tap and Stopple Operations was a challenging aspect of the project.

TEKFEN was able to prove its skills and capability once again coping with S. Aramco’s high engineering, construction and safety standards.