TURKMENISTAN - GALKYNYSH GAS FIELD DEVELOPMENT PROJECT

Tekfen Job No:

327

Location:

Yoloten, Turkmenistan

Client:

Petrofac International (UAE) LLC

Contractor:

Tekfen Construction and Installation Co., Inc., Petrofac UIL

Tekfen Portion:

100%

Commencement:

28/02/2011

Completion:

31/12/2013

Galkynysh gas field is in Mary region of Turkmenistan. The overall gas development project targets upstream and treatment and downstream works of 40 billion cubic meters natural gas annually.

Out of this 40 billion cubic meters, the EPC works for 10 billion cubic meters including upstream works, flow lines, trunk lines, GTUs, central gas processing facility and 56 gas export pipeline are under the scope of Petrofac UIL. Accordingly, Tekfen has been awarded for the "utilities and offsites" works of the Central Gas Processing facility including civil, mechanical, electrical and instrumentation works and the installation of the 100 km long 56" cross-country export sales gas pipeline together with assistance to commissioning works after the mechanical completion of the aforementioned works.

Project Major Quantities


Excavation & Backfill: 1.000.000 m3
Reinforced Concrete: 25.000 m3
Building: 1.300 m2 Central Control Room (EPC)
Steel Structure Erection: 6.100 Ton
Tank Erection: 3.143 ton
Other Static Equipment Erection: 4.735 ton
Rotating Equipment Erection: 2.300 ton
Plant Piping Erection: 129.000 Dia inch; 4,620 ton
Sales Gas Export Pipeline: 100 Km Cross-country 56" pipeline
River Crossing: 1 nos. (850 m 56 HDD)
Electrical Cabling: 650 Km
Telecom Cabling: 57 Km
Instrumentation Cabling: 345 Km
Fiber Optic Cabling: 100 Km
Pipe Insulation: 33,700 m2
Equipment Insulation: 19,270 m2