SAUDI ARABIA - YANBU- NORTH JEDDAH PIPELINES PROJECT

Tekfen Job No:

352

Location:

Saudi Arabia

Client:

Saudi Arabian Oil Company (Saudi Aramco)

Contractor:

Tekfen Construction and Installation Co., Inc.

Tekfen Portion:

100%

Commencement:

15/11/2016

Completion:

14/10/2020

The purpose of the project is to efficiently meet the Kingdom’s refined product demands in Makkah Province. A new pipeline system (YNJ-1 & YNJ-2) with ultimate capacity of 577 MBD (240 MBD & 337 MBD respectively) is planned to deliver products from the proposed Yanbu’ Distribution Hub to the existing and expanded North Jeddah Bulk Plant facility.

The pipelines shall use a dual pipeline arrangement to deliver two grades of gasoline (PG91 & PG95), ULSD and Jet A-1 refined products to an upgraded and expanded NJBP.


FACTS AND FIGURES

Pipelines to be built:
YNJ-1: 20”*333,5 Km gasoline pipeline
YNJ-2: 24”*333,5 Km Diesel & Jet A-1 pipeline

Other Main Facilities:
8 valve stations (furnished with RTU's )
4 scraper traps
430 km of 48-strand ITU-G.652D Single-Mode Fiber Optic Cable (FOC)
18 nos. road Thrustboring +1 railroad Thrustboring work
Supply and install complete solar system at the LDS and install 24VDC Power Panel stations at KM 80.00and KM 170.00
Cathodic protection
Provision of communication network infrastructure to facilitate transport of instrument data signals from remote
LDS and RTUs along the new Yanbu-Jeddah pipeline corridor to OSPAS in Dhahran, and LDS Master
Processor at EWSP-6.
Leak defection

Work Quantities:
Number of Weld Joints:27.776 Joints(14.674.000 inch meters)
Trench Excavation: 2.015.000 m3 (245.000 m3 Rock + 1.770.000 m3 others)
ROW Excavation:1.440.000 m3( 620.000 m3 Rock + 820.000 m3 others)
Padding Sand + Bedding Material : 998.000 m3
Final Backfill Material:1.057.648 m3
Marl Material(For Sabkha Section): 226.408 m3
Concrete: 3,500 m3(Pipeline +Valve Stations)
Pipe Installation(Block Valve Stations & Scraper Trap Stations : 1,250 Dia inch
Structural Steel: 220 Tons
Thrustboring: 19 nos.(18 roads+1 railway)
FOC : 430 km
Instruments: 192 nos.
Instrument Cable : 15.600 mt
Electrical Distribution Panel + UPS panel : 36 nos.
Electrical Cable: 18.500 mt
Over Head Power Line : 6.500 Mt.