KAZAKHSTAN - ATYRAU REFINERY, RECONSTRUCTION WORKS

Tekfen Job No:

281

Location:

Atyrau, Kazakhstan

Client:

KazMunaiGaz, Kazakhstan Oil & Gas Company

Contractor:

GATE (Tekfen Construction and Installation Co., Inc. - Gama) as cooperating partner of JGC, Japan

Tekfen Portion:

50%

Commencement:

11/05/2004

Completion:

30/11/2005

GATE, a partnership of Tekfen & Gama has undertaken Atyrau Refinery Reconstruction (ARR) Project in Kazakhstan in partnership with the JGC of Japan.

The purpose of the project is to modernize the existing Gasoline and Sulphur Units in the Refinery in order to increase the production to 6 mtpa and enhance the quality of the products.

The project scope includes civil, mechanical, electrical and instrumentation works.

HIGHLIGHTS

  • Pile Head Treatment: 1.380
  • Excavation: 10.200 m3
  • Structural Concrete: 6.500 m3
  • Reinforcing Steel: 1.000 t
  • Forming: 25.000 m2
  • Paving: 20.500 m2
  • Steel Fabrication: 1.650 t
  • Steel Erection: 1.650 t
  • Claddings: 6.000 m2
  • Equipment Erection: 3.500 t
  • Prefabrication (Piping): 160.000 wid
  • Erection (Piping): 80.000 wid
  • Pipe Support Fabrication: 153 t
  • Radiographic Film (Piping): 83.000 sheet
  • Equipment Insulation: 2.500 m2
  • Piping Insulation: 151.500 I.M
  • Blasting & Priming: 41.000 m2
  • Finish Painting: 59.000 m2
  • Central Control Building: 576 m2
  • Sulphur Solidification Building: 469 m2
  • Modification of AT-2 Room: 1.548 m2
  • Floor Heatings: 149 m2