MOROCCO - TOPPING UNIT 4 (CDU-4) PROJECT

Tekfen Job No:

321

Location:

Mohammedia, Casablanca, Morocco

Client:

Société Anonyme Marocaine De L'industrie Du Raffinage (SAMIR)

Contractor:

Tekfen Construction and Installation Co., Inc.

Tekfen Portion:

100%

Commencement:

03/06/2010

Completion:

31/12/2012

Société Anonyme Marocaine de l’Industrie du Raffinage (SAMIR) is one of the largest companies operating in Morocco and owns the sole refinery of the country. The refinery located at Mohammedia, on the Atlantic coast, about 30 km north east of Casablanca.

Crude oil distillation and Kerosene treatment units will have a yearly capacity of 4 million tons and 600 thousand tons respectively.

With this Project, the new unit of crude oil distillation (CDU-4) will feed the entries of recently completed Upgrade Project.

Tekfen's scope of work include detailed engineering for civil works, purchasing of civil, steel structure,painting, insulation material, construction works including civil, mechanical, electrical, instrumentation, painting, insulation, fabrication of steel structures, pipe spools and pipe supports and assistance to precommisioning, commisioning, start up and performance tests.

Main Project Work Volumes (Estimated):

Excavation / Backfilling: 38.000 m3
Roads: 1.000 m2
Concrete:7.200 m3
Buildings: 636 m2
Steel Structure: 830 ton
Piping (A/G & U/G): 1.870 ton
Pipe Support: 430 ton
Equipment: 3.000 ton
Cable Installation: 95 m
Termination: 6.850 ea.
Painting: 38.100 m2
Insulation: 43.300 m2