UZBEKISTAN - FERGANA REFINERY MODERNIZATION WORKS

Tekfen Job No:

222

Location:

Fergana, Uzbekistan

Client:

Uzbekneftegas

Contractor:

Tekfen Construction and Installation Co., Inc.

Tekfen Portion:

100%

Commencement:

05/02/1998

Completion:

31/01/2000

The project covers the modernization works of the existing Fergana Refinery to produce 1.700.000 t sulphur free diesel from local feedstock gas-oil mixture and 93 octane gasoline from existing units (Reformer 300 / 600) while obtaining 25.000 t / year sulphur.

The project targets an environment friendly refinery with internationally compatible fuel products and large amount of sulphur which can be consumed by the other industries as raw material.

The project scope covered the following process sections

Hydro-desulphurization Unit,
Sulphur Recovery Unit,
Cooling Water Unit,
Demineralized Water Unit,
Nitrogen Unit,
H2S Unit,
Reformer 300 Modernization Works,
Reformer 600 Modernization Works.

Main quantities of Fergana Refinery Modernization / Revamp works are

Excavation / Fill: 70.000 m3
Structure Steel: 2.664 t
Equipment Erection: 4.500 t
Piping: 90.250 m
Total Welding (dia - inch): 244.000
Concrete: 11.961 m3
Reinforcing Steel: 685 t
Cables (power, grounding, lighting): 170 km
Cable Rack / Duct / Tray: 9.917 m
Local Instrument, Final Control Element and Room: 3.500 set
Signal Tubing / Cables: 170 km
Junction / Switch / Outlet Box: 736 set
Final Equipment and Machinery Painting: 6.234 m2
Surface Preparation, Primary and Final Painting of Pipes: 34.221 m2
Pipe Insulation (Hot Tap): 12.789 m2
Equipment Insulation (Hot Tap): 3.602 m2
Instrument Insulation (Hot Tap): 246 m2
Refractory Works: 200 m3

Tekfen successfully delivered the EBRD ( European Bank for Reconstruction and Development) financed project complying with the highest international construction standards in cooperation with Toyo and Mitsui.