GEORGIA - MECHANICAL, ELECTRICAL, PIPING AND INSTRUMENTATION WORKS IN SUPSA TERMINAL

Tekfen Job No:

220

Location:

Supsa, Georgia

Client:

Georgian Pipeline Company

Contractor:

Tekfen Construction and Installation Co., Inc. - Azfen J.V. Alliance

Tekfen Portion:

50%

Commencement:

27/10/1997

Completion:

26/03/1999

Mechanical, piping, electrical and instrumentation works at the export end of the Baku - Supsa Crude Oil Pipeline at Supsa Terminal. The scheme is part of the Azerbaijan Early Oil Transportation Project of Azerbaijan International Operating Company, AIOC; the Georgian section of the scheme is under the responsibility of GPC / Georgian Pipeline Company.

QUANTITIES

Fabrication of 350 t pipes (diameters varying between 1/2 and 48)
Pipe Erection: 650 t
Blasting & Painting: 7.400 m2
Erection: 70 t
Equipment Erection: 150 t
Insulation: 600 m2
Heat Tracing: 600 m
Earthing: 9.500 m
Electrical Cabling: 57.000 m
Instrumentation Cabling: 19.700 m
Fire & Safety Cabling: 27.600 m
Cable Terminations: 10.000
Instrument Installation: 180
Cathodic Protection System consisting of 6.000 m Cabling, 150 Anodes, 150 Thermo-welding

The project was successfully delivered by Tekfen - Azfen Alliance within schedule and complying with the highest international standards.